Possible to change order of menulets (menu icons) in Lion?


the string of icons in desktop menu tooooooo long. means fantastical--the furthest icon left--is hidden behind app menus.

know if there's way arrange order of menulets (are still called these days) in lion?
 

simply click hold , drag whichever order prefer
 


Forums Macs macOS Older OS X Versions Mac OS X Lion (10.7)


  • iPhone
  • Mac OS & System Software
  • iPad
  • Apple Watch
  • Notebooks
  • iTunes
  • Apple ID
  • iCloud
  • Desktop Computers
  • Apple Music
  • Professional Applications
  • iPod
  • iWork
  • Apple TV
  • iLife
  • Wireless

Comments

Popular posts from this blog

Permissions Problem?

iPhone won't sync with iTunes

Fashion Place Mall Murray, UT